Skip to content

Energy · Multi-country

National Solar & Energy Storage Program

A program assessing utility-scale and distributed solar generation paired with storage, to add dispatchable capacity where the grid can accept it.

NBP-1 · Initial ScreeningConceptUnder StudyNBP-ENE-NSES
National Solar & Energy Storage Program — concept visualization
Concept Visualization

Executive Overview

A program assessing utility-scale and distributed solar generation paired with storage, to add dispatchable capacity where the grid can accept it. The program is at NBP-1 on the NBP readiness ladder and is recorded at concept confidence. Scope, cost and structure remain subject to the studies listed below.

Development Challenge

Solar generation alone shifts rather than solves an evening peak. Without storage, additional solar capacity delivers limited reliability benefit.

Strategic Rationale

Add generation capacity that can be deployed quickly and sited close to demand, reducing transmission losses and improving supply during peak periods.

Proposed Solution

Study paired solar and storage deployments at sites selected for grid acceptance capacity, irradiance and land availability, with mini-grid options for areas the grid does not reach.

Project Components

  • Utility-scale solar arrays
  • Battery energy storage
  • Distributed rooftop solar
  • Mini-grid systems
  • Grid connection works

Location & Beneficiaries

Location: Multi-country, Africa

Grid-connected consumers, off-grid communities, and industrial users requiring reliable daytime supply.

Technical Requirements

  • Technical scope to be established through pre-feasibility study
  • Design standards to follow applicable national and international codes
  • Environmental and social screening prior to design finalisation

Enabling Infrastructure

  • Grid acceptance capacity
  • Land availability
  • Regulatory framework for independent generation
  • Technical operations skills

Market Context

Solar and battery costs have fallen substantially over the past decade, altering which configurations are financially viable in the region.

Implementation Structure

Delivery and ownership structure to be determined at commercial structuring (NBP-6). Options include public delivery, partnership structures and concession models, assessed against value for money and risk allocation.

Capital Requirements

Estimated CAPEX

Not yet established

Concept

Funding Secured

None

Verified

Source: NBP programme records

Funding Requirement

Under study

Under Study

To be determined. Suitable capital categories will be assessed at NBP-6 and NBP-7 against the project’s risk profile and revenue characteristics.

Revenue & Sustainability Model

Revenue and sustainability model under development. Where user charges are not viable, availability-based or budget-funded models will be assessed.

Economic & Social Impact

Economic Impact

Under study

Under Study

Employment Potential

Under study

Under Study

Local Content

Under study

Under Study

Environmental & Social Considerations

Classification: To be assigned following environmental and social screening.

Environmental assessment will be completed to the standard required by national regulation and applicable lender policy before any commitment is sought.

Social assessment will address land, livelihoods, resettlement risk, community consultation and equitable access to the resulting service.

Project Dependencies

Grid acceptance capacityUnder Study
Land availabilityUnder Study
Regulatory framework for independent generationUnder Study
Technical operations skillsUnder Study

Risk Register

Preparation risk — studies may alter scope materially

Moderate

Mitigation: Staged approval at each readiness gate

Funding risk — no capital is committed at this stage

High

Mitigation: Early engagement with development finance institutions

Institutional coordination across multiple authorities

Moderate

Mitigation: Defined coordination protocol agreed before NBP-5

Implementation Roadmap

  1. 1Concept developmentCurrentScope, beneficiaries and components defined at concept level.
  2. 2Pre-feasibilityNextTechnical and commercial viability tested at order-of-magnitude level.
  3. 3FeasibilitySubsequentFull technical, financial, environmental and social case established.
  4. 4Structuring & financingSubsequentDelivery model settled and capital matched to the opportunity.

Related opportunities

Energy

Continental Clean Energy & Grid Modernization Program

A program to strengthen electricity reliability through diversified generation, transmission reinforcement and distribution modernization.

Concept