NBP Delivery

Project delivery operating system

Seventeen tracked dimensions per programme, so that progress is evidenced rather than asserted.

No programme in delivery

No initiative has reached delivery — the registry is at concept and early study stage. What follows is the structure a programme is tracked against once construction begins. Milestones are verifiable completion points rather than progress percentages, because a percentage is an opinion and a milestone is a fact.

Scope

What the programme includes, and what it explicitly does not.

Workstreams

Parallel bodies of work with their own owners.

Tasks

Assigned actions with owners and due dates.

Dependencies

What must exist before a workstream can proceed.

Milestones

Verifiable points of completion, not progress percentages.

Schedule

Planned against actual, with variance made visible.

Budget

Committed, spent and forecast, each classified for confidence.

Contracts

Executed agreements, variations and their obligations.

Approvals

Statutory consents obtained and outstanding.

Procurement

Packages, their status and their award.

Construction

Site progress against the programme.

Issues

Live problems with an owner and a resolution path.

Risks

Registered risks with severity, mitigation and residual exposure.

Inspections

Quality, safety and environmental inspection outcomes.

Documents

Drawings, certificates and correspondence under version control.

Payments

Certified applications and their settlement.

KPIs

Delivery indicators reported to the accountable institution.

Visual progress

Six evidence sources, compared chronologically. Independent sources matter: satellite capture verifies activity without depending on the reporting of the party being measured.

Site photographs

Dated, geotagged records from defined vantage points so comparison is like for like.

Drone imagery

Periodic aerial capture showing earthworks and structural progress at scale.

Satellite imagery

Independent verification of site activity without relying on contractor reporting.

BIM

The design model against which as-built condition is compared.

GIS

Spatial context: land, utilities, access and environmental constraints.

Construction milestones

Verifiable completion points, each evidenced by inspection.